Original draft drawing of fountain from the "Rose Red" movie art department |
 |
First the existing trees and shrubs were removed from the center of the circular driveway
|
 |
Then the hole is dug for the bottom and foundation of the fountain
|
 |
Rebar is added and final adjustments made before the cement is poured
|
 |
The cement is poured, then finished smooth |
 |
The first course of cement block is added
|
 |
Three rows of concrete block were then added
|
 |
After the block walls are laid with cement, wire mesh is wrapped around the wall
|
 |
The block walls are then toweled with two layers of cement
|
 |
Solid concrete pavers are cemented on top of the wall and a pattern toweled into the outside wall |
 |
Here is the finished fountain, in the morning mist |
 |